TT04 - Total Kharir CPU Fire Fighting Upgrade Proj
Client : TOTAL E&P Yemen
SCOPE OF WORK :
Engineering, Procurment & Construction (EPC)
Installation of underground 14" fire water network and 3" foam network covering the CPU area, equipped with 9 water hydrants, 37 water/foam hydrant monitor and 37 hose boxes
Installation of fire water curtains at the oil storage tank area
Installation of two diesel engine driven firewater pumps, motor driven jockey pump and foam package.
Extending the road, Fence and the outdoor lighting to accomodate the new fire water pumps and tank in to the CPU area
Connecting the new fire fighting system to the existing MCC