TT04 - Total Kharir CPU Fire Fighting Upgrade Proj

Client : TOTAL E&P Yemen

SCOPE OF WORK :

Engineering, Procurment & Construction (EPC)

  • Installation of underground 14" fire water network and 3" foam network covering the CPU area, equipped with 9 water hydrants, 37 water/foam hydrant monitor and 37 hose boxes

  • Installation of fire water curtains at the oil storage tank area

  • Installation of two diesel engine driven firewater pumps, motor driven jockey pump and foam package.

  • Extending the road, Fence and the outdoor lighting to accomodate the new fire water pumps and tank in to the CPU area

  • Connecting the new fire fighting system to the existing MCC

20.jpg
JAMEEL AHAMED