KHARIR CCU Extension - Additional Separator and Production Facilities Project.
CLIENT : TOTAL E&P Yemen
Scope of work:
Booster compressor -22MMSCFD 25 Barg
Oil booster pumps – 5 with 2400& 4500 blpd 17 barg
Fuel Gas treatment package – 0.45 MMSCFD
Separator 100,000 blpd /-1
Fire water tank-2, fire water pumps -1
Fire water net works, fire hydrant, fire hydrant monitors
6.6 kv switchboard & 6.6 kv transformers
Installation of 400V MCC and connection of all equipment to this MCC
Update of the control ESD, F&G systems in new Technical building
5km 12” pipe line with pig launcher & pig receivers