Clean Water Tank including gas blanketing.
CLIENT : TOTAL E&P Yemen
Activities & Scope Of Work:
The components and area to be protected
•Degassing boot
•FWKO Drums
•Fuel Gas Scrubber
•Electrostatic Dehydrator Separator
•Oil Skim Tank
•Oil Storage Tanks
•Self Contained Production Facility (SCPF# 1)
The component to be installed in the project
•14” GRP & 3” SS fire water net works - 3 KM
•Water/foam hydrant monitor - 37
•Water hydrant - 9
•Fire water curtains, fire water tank 25m Ø x 18.5 M height – 7996m3
•Diesel driven firewater pump – 2 (1123m3/hr at 11 bar), Jockey pump – 1 30m3/hr – 11 bar